Advertisements

SAP-CO : Product Cost By CO Production Order | W/o Qty Str

Advertisements
Product Cost Without Qty Structure | No PP Module | CO-Production Order | Production And Sales Cycle | Material Ledger
4.7
4.7/5
(23) Ratings
827 students
Created by Simple SAP - MTJ
Advertisements

What you'll learn

  • Language : Urdu/Hindi
  • Lectures Recorded On : SAP S/4HANA 2023
  • Configuration Documents
  • Costing Cycle with CO Production Order
  • Cost Estimate & Its Calculation
  • Production Cycle with Manual Issuance Of RM & AT & its Impact on Costing
  • Sales Order | Delivery, Picking & Post Goods Issue | Billing
  • Variance & Settlement
  • Material Ledger
  • Production with CO Production Order Impact On COPA
This course includes:
1 total hour on-demand video
0 articles
2 downloadable resources
15 lessons
Full lifetime access
Access on mobile and TV
Certificate of completion
Advertisements

Course content

Requirements

  • Basic Understanding Of Costing

Description

Language : Urdu/Hindi

Product Cost By CO-Production Order

The scenario, without quantity structure costing method is used when a material master exists for a product, but a bill of material (BOM) and routing do not. For example, you can use this costing method for products that are still in the prototype phase, but for whom a product cost is required.

You can also use this method for valuating intangible goods such as services for which there is no BOM or routing. With this method you can carry out a cost for materials even if the quantity structure data (such as BOMs and routings) is located in a non-SAP Production Planning system.

Introduction & Configuration

Introduction & Configuration

Material Master & Production Process

Create Material Master (Raw Material & Finished Good)

Alternative Of BOM & Routing & Execute Cost Estimate Of FG Material

Create CO Production Order

Preliminary Cost Of CO Production Order

Raw Material Stock In

Raw Material Issue To CO Production Order

Activity Type Confirmation to CO Production Order

Goods Received Against CO Production Order

Sales Process

Create Sales Order

Delivery, Picking & Post Goods Issue

Billing

Closing

Calculate Variance

Settlement Of CO Production Order

Material Ledger – Actual Costing Run

T-Codes

MM01 | KKPAN | CK24 | KKF1 | KKF4 | MIGO | KB21N |

VA01 | VL01N | VF01 | KKS2 | KO88 | CKMLCP |

KE24 | CKM3N |

Who this course is for:

  • SAP FICO Consultant
  • SAP CO Consultant
  • SAP FICO End User / Power User
  • Accounting & Finance Professionals
  • Cost Accountant
  • SAP Learners
Advertisements
6178F4AD5E95B64392EB
Advertisements
Advertisements
Free Online Courses with Certificates
Logo
Register New Account