Detailed Exam Domain Coverage: Advanced Certified Scrum Master (A-CSM)
To excel as an Advanced Certified Scrum Master, you must evolve from a basic facilitator into a high-impact coach and organizational leader. This practice test bank is structured to cover the core pillars of the A-CSM curriculum:
-
Scrum Mastery and Leadership (33.34%): Diving deep into advanced facilitation techniques, professional coaching, mentoring, and the nuances of servant-leadership and conflict resolution.
-
Scaling Scrum and Agile Practices (33.33%): Understanding how to manage multiple teams using frameworks like SAFe, LeSS, and Nexus while effectively handling cross-team dependencies.
-
Agile Engineering and Technical Practices (33.33%): Focusing on the “definition of done” through Continuous Integration, managing technical debt, and supporting teams in Test-Driven Development (TDD).
Course Description
I have built this course for Scrum Masters who are ready to level up. While the A-CSM path is often journey-based, the knowledge required to succeed in professional environments is vast. I provide 1,500 original practice questions that challenge your situational judgment and technical understanding of Agile at scale.
Every question is followed by a detailed breakdown of all six options. I believe that true mastery comes from understanding the “why” behind Agile values, rather than just memorizing rules. Whether you are preparing for a course assessment or looking to sharpen your on-the-job skills, this question bank provides the rigorous study material needed to succeed on your first attempt.
Sample Practice Questions
-
Question 1: A Scrum Master is working with three teams on a single product. Which scaling approach is most effective for managing cross-team dependencies during a Sprint?
-
A. Having the Product Owner act as the sole communicator between teams.
-
B. Implementing a “Scrum of Scrums” to facilitate inter-team coordination.
-
C. Merging all three teams into one giant 25-person team.
-
D. Allowing teams to work in silos and merging code only at the end of the year.
-
E. Assigning a Project Manager to track dependencies in a Gantt chart.
-
F. Canceling the Sprint if a dependency is identified.
-
Correct Answer: B
-
Explanation:
-
B (Correct): The Scrum of Scrums is a standard scaling technique where representatives from each team meet to discuss progress and resolve dependencies.
-
A (Incorrect): The PO focuses on the “What” (value), not the “How” (coordination of work), which would create a bottleneck.
-
C (Incorrect): Large teams significantly increase communication complexity and violate the Scrum Guide’s recommendation for small team sizes.
-
D (Incorrect): This leads to “integration hell” and ignores the Agile principle of continuous integration.
-
E (Incorrect): This introduces a non-Agile role that undermines team self-management.
-
F (Incorrect): Dependencies should be managed and resolved, not used as a reason to stop work entirely.
-
-
-
Question 2: During a conflict between two developers regarding a technical solution, which facilitation stance should an Advanced Scrum Master take?
-
A. Choosing the solution provided by the most senior developer.
-
B. Telling the developers to stop arguing and follow the original plan.
-
C. Facilitating a collaborative conversation to help the team reach a consensus.
-
D. Escalating the conflict to the Functional Manager immediately.
-
E. Flipping a coin to decide which technical path to take.
-
F. Making the technical decision personally to save time.
-
Correct Answer: C
-
Explanation:
-
C (Correct): An A-CSM uses coaching and facilitation to help the team remain self-organizing and find the best collective path forward.
-
A (Incorrect): This reinforces a hierarchy and can stifle innovation from other team members.
-
B (Incorrect): This is a “command and control” approach that discourages healthy professional debate.
-
D (Incorrect): Scrum Masters should first help the team resolve issues internally before seeking outside intervention.
-
E (Incorrect): Professional decisions should be based on value and logic, not random chance.
-
F (Incorrect): The Scrum Master is a process leader, not a technical decision-maker for the team.
-
-
-
Question 3: How does the “Continuous Integration (CI)” practice contribute to the “Definition of Done”?
-
A. It ensures that code is integrated and tested frequently to find errors early.
-
B. It allows developers to skip writing unit tests.
-
C. It replaces the need for a Sprint Review.
-
D. It extends the Sprint duration to allow for manual testing.
-
E. It ensures that only the Product Owner writes the code.
-
F. It is a marketing tool and has no technical impact.
-
Correct Answer: A
-
Explanation:
-
A (Correct): CI is an engineering practice that maintains a “Potentially Releasable” state by verifying code changes immediately.
-
B (Incorrect): CI actually relies heavily on automated unit tests to be effective.
-
C (Incorrect): The Sprint Review is a vital event for inspecting the increment; CI is a technical practice that supports the creation of that increment.
-
D (Incorrect): Agile engineering aims to shorten feedback loops, not extend the Sprint length.
-
E (Incorrect): CI is a team-wide technical practice; the PO rarely writes the production code.
-
F (Incorrect): CI is a foundational technical practice in Agile engineering with significant impact on quality.
-
-
-
Welcome to the Exams Practice Tests Academy to help you prepare for your Advanced Certified Scrum Master (A-CSM) Mastery Tests.
-
You can retake the exams as many times as you want
-
This is a huge original question bank
-
You get support from instructors if you have questions
-
Each question has a detailed explanation
-
Mobile-compatible with the Udemy app
-
30-days money-back guarantee if you’re not satisfied
I hope that by now you’re convinced! And there are a lot more questions inside the course.